Gate valve replaced using customised mechanical head in a fire water cement lineClient Requirement: The client had a damaged 24” gate valve in their fire water tank line which needed to be replaced without interruption…Apr 19, 2021Apr 19, 2021
48” Hot Tap on Drinking Water Pipeline Successfully Completed with Zero Interruption to SupplySummary of the Project:Apr 19, 2021Apr 19, 2021
32” Line Stop With Bypass For Butterfly Valve Installation On A Gas Flare LineWellube completed a double position line stop operation on a 32” gas flare line to install a butterfly valve and tie-in valve in the…Mar 15, 2021Mar 15, 2021
Customized Pipeline Clamp Avoids Operational DisruptionSummary of the Project Wellube completed online sealing of 68” expansion below seawater leak for an oil & gas facility in Abu Dhabi.Dec 10, 2020Dec 10, 2020